Uncategorized

Landsec to pump £2bn into new house building drive

Developer Landsec is ramping up plans to establish a £2bn residential platform by 2030 as it shifts investment focus away from London offices and into large-scale housing schemes in the capital and Manchester.

 

The redevelopment of the Finchley Road O2 Centre retail park will see £1bn invested in the area to create a major mixed-use urban neighbourhood at the 14 acre site
The redevelopment of the Finchley Road O2 Centre retail park will see £1bn invested in the area to create a major mixed-use urban neighbourhood at the 14 acre site

 

The property giant is preparing to start on site from late 2026 across a trio of major residential-led projects that will deliver more than 6,000 homes.

At Finchley Road in north London, enabling works and demolition have already been completed for the first phase of a consented 1,800-home scheme. Detailed planning is in place for the first 600 homes, with a variation decision expected later this year.

Landsec’s first major urban housing scheme in London at the O2 centre strip site in Finchley

In Manchester, Landsec has restructured its agreement with JV partners at the Mayfield site to unlock the potential for around 1,700 homes. A decision on detailed plans for the first 879 units is also expected in the second half of 2025.

The third key site is in Lewisham, south-east London, where a masterplan covering up to 2,800 homes – including student and co-living accommodation – is awaiting planning sign-off.

Landsec aims to recycle £3bn of capital out of offices and non-core assets to fund the residential push and a further £1bn of retail acquisitions.

Chief executive Mark Allan said: “Our capital allocation decisions from here are about ensuring that the growth outlook for our portfolio in 3-5 years’ time is as positive as it is for our current portfolio today.

“That is why we have set out a clear plan to increase investment in major retail by a further £1bn and establish a £2bn+ residential platform by 2030, to be funded by rotating £3bn of capital out of offices.”

The firm expects gross yields on housing schemes of around 6.5%, with net yields of 4.8–5.5%.

Meanwhile, Landsec has committed £600m to top-tier retail assets including Liverpool ONE and Bluewater over the past year and is targeting another £1bn of investment in prime shopping destinations where yields are currently hitting 7–8%.

Pipeline projects
Project Sq ft ‘000 Start date Planning status
Office-led
Red Lion Court, SE1 250 2026 Consented
Old Broad Street, EC2 290 2026 Consented
Liberty of Southwark, SE1 220 2026 Consented
Hill House, EC4 390 2026 Consented
Southwark Bridge Road, SE1 140 2026 Consented
Nova Place, SW1 60 2027 Design
Timber Square Phase 2, SE1 380 2027 Design
Total 1,730
Residential-led
Mayfield, Manchester 1,800 2026 Consented
Finchley Road, NW3 1,400 2026 Consented
Lewisham, SE13 1,900 2027 Planning application
MediaCity Phase 2, Salford n/m n/m Design
Total 5,100

 

Read More

Tide gets go-ahead for over 1,000-home London scheme

Volumetric housing specialist Tide has bagged planning approval for a 1,051-home scheme near Bermondsey in London.

 

The four blocks at Ilderton Road step down in height from the station to the south
The four blocks at Ilderton Road step down in height from the station to the south

 

The revised scheme for Ilderton Road in Southwark ramps up affordable housing by 55% to 186 social rent units and boosts the co-living element from 605 to 865 homes.

Designed by architect tp bennett, the four-block development will transform a vacant brownfield site with a mix of high-density housing and upgraded public realm, including a revamped central pocket park.

Construction is due to start this year using Tide’s offsite manufacturing arm Vision Volumetric, with completion set for 2027.

The modular build will allow the scheme to go up 50% faster than traditional methods while cutting embodied carbon.

Red brick façades nod to Bermondsey’s industrial heritage

Helen McManus, head of planning at Tide, said the scheme showed how “volumetric construction can deliver more affordable housing for local authorities in a faster, sustainable, high-quality and efficient way”.

The scheme adds to Tide’s growing co-living portfolio, including Enclave: Croydon – the UK’s largest operational co-living development – and The Castle in Acton, which is nearing completion after an 18-month build.

Read More

Mayor backs 46-storey student tower at Canary Wharf

London’s mayor has given Canary Wharf Group the planning green light for a 46-storey student accommodation tower at its Wood Wharf estate.

The scheme at 7 Brannan Street will deliver 912 bedrooms and is the latest move to diversify the growing residential community at the Docklands district.

Designed by Howells, the tower will feature communal and leisure spaces at ground, mezzanine, ninth and roof levels. Plans also include new ground floor retail and two waterside public gardens.

The project was rejected by Tower Hamlets Council in November last year but was later called in by the mayor’s office, which has now given it the go-ahead.

Tom Venner, chief development officer at Canary Wharf Group, said: “7 Brannan Street will be a fantastic addition to the diverse range of residential offerings at Canary Wharf.”

He added the scheme would help meet demand for student housing in a location offering access to green spaces and strong transport links.

Canary Wharf is already home to more than 3,500 residents and education providers including the UCL School of Management at One Canada Square. The new tower will bring students into the heart of a district long known for finance but now repositioned as a vibrant place to live, work and study.

Read More

London to relax green belt building rules

Mayor of London Sadiq Khan is “actively exploring” the release of parts of London’s green belt for development. Khan said his position on the green belt has changed because “bold solutions” are required to fix London’s housing crisis.

 

To meet demand, London needs 88,000 new homes a year over the next decade: close to a million homes. The capital has never built this number of homes before, and only ever built at anything close to this rate when there was a housing boom across the country in the 1930s.

 

Khan said the current approach to only build on brownfield land will never be enough to meet the scale of the challenge.

 

Releasing some carefully chosen areas of green belt for development could unlock hundreds of thousands of new homes for Londoners.

 

The right transport and infrastructure will play a pivotal role in the new approach, enabling higher density developments near public transport connections.

 

Khan said: “We clearly face an extraordinary challenge. As Mayor, I’m determined to give it everything we’ve got – with a radical step-change in our approach.

 

“We’ll be working with councils and others to secure as many new homes as we can on brownfield sites, both large and small, but we have to be honest with Londoners that this alone will not be enough to meet our needs.

 

“That’s why I’m announcing that City Hall’s new position will be to actively explore the release of parts of London’s green belt for development.

 

“The perception many people have is that the green belt is all beautiful countryside, green and pleasant land, rich with wildlife. The reality is very different. The green belt can often be low-quality land, poorly maintained and rarely enjoyed by Londoners. Only around 13 per cent is made up of parks and areas that the public can access.

 

“So given the quality of parts of the London’s green belt and the extent of the housing crisis, I believe the status quo is wrong, out-of-date and simply unsustainable. Development on carefully chosen parts of the green belt – done in the right way – would allow us to unlock hundreds of thousands of good quality new homes for Londoners. This would not only go a long way to ending the housing crisis but provide a huge boost to our economy.”

Read More

Go-ahead for London City office-to-flats scheme

Developer HUB and funding partner Bridges Fund Management have secured planning for a major office-to-residential conversion at 150 Minories in Aldgate.

 

150 Minories co-living scheme approved
150 Minories co-living scheme approved

 

The scheme, known as the Assemblies, will transform a 1950s City office block into 277 co-living homes aimed at creative and business communities in East London and the Square Mile.

Designed by Morris+Company, the project will retain the building’s structure, slashing embodied carbon by 65% against the Greater London Assembly benchmark.

The project features an extension to the building’s rooftop and rear and the addition of an upgraded high-performing façade.

Existing space will be increased from around 6,900 sq m to 10.400 sq m.

A circular economy approach will also be used in the strip-out, with reused materials and high-recycled-content components helping cut waste and emissions.

Work is expected to start on the conversion in 2026. Max Fordham is supporting the design as M&E consultant with London Structures Lab providing structural engineering.

Assemblies is HUB’s second ultra-urban adaptive reuse scheme in the City following Cornerstone at 45 Beech Street near the Barbican.

Read More

FirstPort Temporarily Suspended from Trade Body Following Independent Adjudication

FirstPort, one of the UK’s largest residential property management companies, has had its membership with The Property Institute (TPI) temporarily suspended for three months following an independent adjudication process.

In a statement, TPI confirmed the suspension, citing a breach of membership rules:
“Following independent adjudication, FirstPort Property Services Limited (FirstPort) has been suspended from TPI Company membership due to a breach of membership rules.”

Background and Leaseholder Concerns

FirstPort, which manages over 400,000 leasehold homes, recently attended a meeting in Parliament with MPs who raised concerns on behalf of leaseholders. Residents from Crown Heights and Regent Court in Basingstoke voiced issues related to service charge increases, building maintenance, and communication with residents.

At the meeting, MP David Pinto-Duschinsky shared that he had received multiple complaints from constituents regarding FirstPort’s service charges and responsiveness.

The discussion also touched on wider concerns in the leasehold sector, with Housing Minister Mathew Pennycook reaffirming the Government’s commitment to strengthening regulation of managing agents. He stated:

“We are very much aware that some managing agents provide a very poor quality of service. Managing agents play a key role in the maintenance of multi-occupancy buildings and freehold estates, and their importance will only grow as we transition towards a commonhold future.”

FirstPort has acknowledged the temporary suspension and clarified that it relates to a specific issue in its handover process to a new managing agent, which began in 2023.

In a statement, FirstPort said:
“One of our TPI memberships has been temporarily put on hold until the beginning of March whilst we review and improve an internal process. This does not relate to core business-wide practices but to a specific issue in our handover process to a new managing agent.

“We have responded positively to the issue raised and we will continue to make improvements to our ways of working. We remain committed to continuing our work with TPI to improve standards across the industry.”

As the industry continues to evolve, leasehold reform and the regulation of managing agents remain a key focus for stakeholders. The Government has indicated it is considering further regulatory measures based on recommendations from Lord Best’s 2019 report on property agent regulation.

FirstPort’s membership with TPI is expected to be reviewed in March 2025. In the meantime, the company has stated it will continue working on internal improvements and industry-wide best practices.

Read More

HG to build 500-bed London Stratford student scheme

HG Construction will deliver a 500-bed purpose-built student accommodation in the heart of Stratford, East London.

 

N16 Stratford is targeting an EPC rating of A and a BREEAM rating of Outstanding
N16 Stratford is targeting an EPC rating of A and a BREEAM rating of Outstanding

 

The N16 Stratford scheme is being developed in partnership with its student business HG Living and M&G Real Estate.

Constructed over two blocks reaching 10 and 18 storeys, the project will also include over 1,500 sq m of amenity space for students, including roof terraces and courtyards.

Work on the project is expected to start this year, subject to Building Safety Regulator gateway 2 approval.

HG Construction will self-deliver key elements of the build process, securing programme and quality benefits.

Adam Quinn, CEO of HG Construction, said: “As we continue to navigate the ever-changing construction market, we are learning to adapt as an industry.

“Working in partnership as funder, developer and contractor has enabled us to overcome early challenges to successfully secure this scheme.

“We are well underway with preparing the BSR submission and we look forward to making a meaningful start on construction towards the end of year in preparation for receiving students in the 2028/2029 academic year, and to working collaboratively with M&G Real Estate as the scheme progresses.”

Read More

Berkeley’s £600m Borough Triangle project approved

Developer Berekely has got the planning green light for its 900-home Borough Triangle scheme in South London.

 

Borough Triangle scheme consists of four blocks
Borough Triangle scheme consists of four blocks

 

The controversial scheme, which will see the demolition of a popular pop-up food market, scraped through Southwark’s planning committee in the face of local opposition.

Designed by architect Maccreanor Lavington, two of the four blocks will be landmarks in the area, rising to 38 and 44 storeys respectively.

The affordable housing content consisists of 230 homes in the form of social rent and shared ownership tenures, which is 35% by habitable rooms.

The bulk of the Borough Triangle site bounded by Newington Causeway, Borough Road and a railway line

Demolition and construction phases are expected to take nine years, starting in 2026 and finishing in 2034.

The full construction cost of the project is estimated at just over £600m.

The professional team used by Berkeley includes M&E engineer L&P Group, structural engineer Walsh and facades consultant Total Facade Solutions.

Councillor Helen Dennis, cabinet member for new homes and sustainable development, said: “We urgently need more affordable homes for local people and despite the many complexities around this site, I am pleased we have secured a policy compliant affordable housing offer – at 35% affordable including 25% social rent homes.

“That will deliver 153 homes for Southwark families on the housing waiting list which are desperately needed.

“The development will also deliver a 5,000 sq ft new community centre earmarked for the Latin American community and a new home for Mercato Metropolitano.”

Read More

Green light for London Euston Tower rebuild

British Land has secured planning approval for a £600m scheme to redevelop the landmark Euston Tower in London.

 

 

The developer aims to retain and re-use the existing 1960s building core and foundations at its Regent’s Place site, while adding new low carbon structures to create a new-look 31-storey building with bigger floor-plates.

Lendlease was involved in pre-construction planning work on the new tower, including designing the outline demolition and construction approach, although the appointment of a main contractor is yet to be announced.

David Lockyer, Head of Development at British Land, said: “We are delighted to receive planning consent for this incredible scheme – the first West End tower in a generation, and likely to be the last.

“The tower is ideally located at our Regent’s Place campus, where the Knowledge Quarter meets the West End, and where businesses can benefit from the great concentration of academic and research institutions between Harley Street and King’s Cross.”

Read More

Green light for 2,100 homes at old East London gasworks

Berkeley Group’s St William division has finally secured full planning to restore the UK’s largest surviving cluster of Victorian gas holders to create 2,100 new homes within the heritage site.

 

The developer can progress the Bromley-by-Bow Gasworks scheme in East London after completing a Section 106 legal agreement with the London Borough of Newham.

Architect RSHP drew up plans to incorporate many of the new homes within the cast iron structures

The developer has worked closely with the council and Historic England to unlock the hugely complex 23-acre brownfield site, which will see a £72m investment in the temporary dismantling, restoration and re-erection of the listed gasholders.

Seven gasholder frames will contain buildings of up to 10-storeys, a further six new buildings will surround these, rising to 15-20 storeys and echoing the cylindrical designs.

The regeneration programme is forecast to create over 2,800 on-site jobs during construction, 30,000 sq ft of new commercial space and will make a £4.4m contribution towards local skills and employment programmes.

The site is home to 7 of the last 19 listed gasholder remaining in the UK

Structural steel engineering specialists Craddys and Shepley was closely involved in drawing up plans to reuse the cast iron gas holder structures, built between 1870 and 1882 for a cost of £300,000.

Both firms were previously involved in the project to dismantle, refurbish and re-erect the Gasholder No.8 guide frame at Kings Cross as well as the refurbishment and re-erection of the Kings Cross Triplets Gasholders.

St William submitted a hybrid planning application for the site, which also include the remains of two gas holders destroyed by the Luftwaffe in the second World War.

New lake at centre of the site where gasholder once stood before being destroyed by bombing.

The second damaged gasholder will be turned into a community space covered with one of the gas holder cylinder iron frames.

Planned community area framed with iron frame from one of the old gasholder tanks

Read More